Unified Development Ordinance

UDO rewriteUDO & MSSD Rewrite 

The Unified Development Ordinance (UDO) and Manual of Specifications, Standards and Design (MSSD) are being rewritten to implement the policies and recommendations of the Comprehensive Plan, which includes, among other adopted plans, the 2021 Northeast Community Plan, the 2022 Wake Forest Community Plan, and the 2024 Wake Forest Downtown Plan. Drawing on best practices in zoning and land use regulations, the rewrite addresses the current conditions in Wake Forest, which are very different from what they were in 2013. Another objective of the rewrite is to ensure the UDO and MSSD comply with current state and federal law. The zoning map, which is a legal document that illustrates the zoning districts where different development rules apply, will also be repealed and replaced as part of this project.

The rewrite project began in 2022. Following over two years of in-depth analysis, broad public engagement, and an iterative drafting process, the draft UDO was proposed for adoption in December 2024. That same month, state legislation was introduced and went into effect that limited the ability of local governments, state-wide, to make certain zoning map and ordinance amendments. After careful evaluation of the law, the Town is moving forward with full-scale repeal of the current UDO and adoption of a new, comprehensively rewritten UDO rather than an amendment of the existing ordinance.

Since 2025, Town staff has been updating the draft UDO that was circulated in December 2024 to ensure it is consistent with changes in state and federal law. Staff also made minor revisions to address issues identified since the last draft was completed. The 2026 Draft UDO is now available. 

2026 Draft UDO (PDF, 10.87 MB)

2024-26 Draft UDO Revisions Summary (PDF, 68.94 KB)

 

Share Your Feedback

All who are interested are encouraged to review it before it moves forward for a public comment session and recommendation at the November 10, 2026, Planning Board meeting. Comments on the 2026 Draft UDO may be submitted using the Engage Wake Forest "Share Your Feedback" comment form. 

Share Your Feedback

It is anticipated that the UDO will be brought forward for public hearing and adoption by the Board of Commissioners in January 2027.

Following the UDO adoption, a new Zoning Map, which is the official map showing the boundaries of the UDO’s zoning districts in the Town’s jurisdiction, will be prepared and made available for public input before being presented for adoption. This change is necessary to ensure the Zoning Map aligns with the zoning districts in the new UDO.

 

Open Office Hours

In addition, the Planning Department will host Open Office Hours in the Wake Forest Town Hall Ground Floor Meeting Room, 301 S. Brooks St., on the following dates and times:

  • Monday, Oct. 26, 11 a.m.-1 p.m.
  • Tuesday, Oct. 27, 7-9 a.m.
  • Monday, Nov. 2, 4:30-6:30 p.m.

During Open Office Hours, Planning staff will be available to answer questions and receive input on the 2026 Draft UDO from community members who drop in during the scheduled times. No appointment is necessary, and there will be no formal presentation. Please note: Attendees are urged to access the Ground Floor Meeting Room via Town Hall’s Taylor Street entrance.

For any questions or comments on the 2026 Draft UDO or the adoption process, please email Tim Richards or call the Planning Department at 919-435-9510.

 

Current UDO

The Wake Forest Unified Development Ordinance (UDO), along with the Town’s Manual of Specifications, Standards and Design (MSSD), establish the requirements for all development activity in the Town’s jurisdiction. The UDO combines into a single document the regulations for zoning, subdivision, land use, grading, stormwater management, and historic preservation. The MSSD includes the technical standards and specifications for roads, parking lots, stormwater infrastructure, etc. The current UDO and MSSD were originally adopted in 2013 and have undergone numerous amendments in the intervening years.

Current UDO

Initially adopted in 2013, the current Unified Development Ordinance (UDO), remains the main reference for zoning, subdivision, land use, grading, stormwater management, historic preservation, and development regulations. 

 

FAQs

The Town hired Houseal Lavigne in the spring of 2022 to rewrite the UDO and MSSD. Planning staff will manage the project.

It is critical that all of Wake Forest’s stakeholders are involved in the development of the rewritten UDO and MSSD. The stakeholders vary and include, but are not limited to residents, businesses, municipal partners, community organizations, staff, and elected officials.

In addition, a technical review group will be formed to provide a thorough evaluation and analysis of ordinance elements as they are prepared.

Ultimately, the Wake Forest UDO and MSSD will be presented to the Planning Board for a recommendation and presented for adoption by the Board of Commissioners.

The Community Engagement section of this page describes all the opportunities available to provide your input, including public meetings. Any meeting dates and times throughout the process will be listed to the project web page as they are scheduled.

Additionally, online surveys will be posted on this page and Engage Wake Forest.

Finally, materials from meetings and more information detailing the Wake Forest UDO and MSSD comprehensive rewrite process can be found on this page.

The UDO governs how development occurs, ranging from getting a permit for a shed in your yard to development of residential subdivisions and commercial buildings. It codifies which uses are allowed where and associated requirements. Ever wonder why there are street trees along the streets or why industrial uses are located in limited areas?

The UDO sets these requirements and helps us implement the goals for the town established in the comprehensive plan.

The current UDO and MSSD will continue to be used until the rewritten UDO and MSSD are adopted.

During the two-year update process, there may be smaller text amendments to these documents that will follow the required public hearing processes.

The UDO regulates a range of development activity, including establishing zoning districts, dimensional standards (ex. height, building setbacks, lot sizes), allowable uses, subdivision standards, infrastructure requirements, parking, landscaping, tree preservation, stormwater, lighting, signage, building design and processes.

There are some topics that local governments do not have the statutory authority to regulate or have very limited power to regulate, such as tree preservation, single family design standards, certain types of uses, certain off-site impacts, and the extent of riparian buffer restrictions.

The comprehensive plan are policy documents that set out the vision and goals for the community on topics such as land use, housing, transportation, historic preservation, and special areas of town. The plans guide important decisions but are not the law.

The UDO is a regulatory document that pertains to a wide range of development activity and land use decisions.

Zoning districts regulate which uses are allowed in which districts and may include supplemental use standards. For example, a supplemental use standard may require that a certain use only be allowed in a certain district if it is located on a higher classified street rather than a local street. Zoning districts also regulate dimensional and bulk standards, which include required lot size and width; building setbacks; building height; and building frontage. Other development standards related to form and development layout, such as parking configuration and building design, may utilize different requirements for different zoning districts.

The current zoning districts have been analyzed for alignment with the Land Use Plan and Map within the Community Plan and Northeast Community plan. In order to meet the goals and vision of these plans, some existing zoning districts are proposed to be changed while new zoning districts are also proposed to address gaps. Additionally, some existing zoning districts that are similar to one another are proposed to be consolidated.

Local government regulations and HOA regulations are separate. HOA regulations often provide an additional layer of requirements and can be enforced by the HOA. The Town does not enforce HOA regulations. If the HOA covenants restrict uses beyond what is permitted by the zoning district, the covenant rules supersede the zoning use regulations because they are more restrictive.

Overlay districts set standards for certain areas that are in addition to the base zoning district. Overlay districts often pertain to protecting or promoting something unique to a certain area.

North Carolina General Statutes limit the authority of municipalities to establish a temporary moratorium on development. The Town is prohibited from establishing development moratoria for the purpose of developing and adopting new or amended plans or development regulations governing residential uses.

The Town of Wake Forest does not have legal authority to prohibit clear-cutting of land under North Carolina law. For proposed development, the Town can require minimum landscape standards, such as the types, location, and size of new vegetation.

North Carolina local governments cannot require certain design standards for single family detached, duplex, and townhome developments, including type or style of materials, windows, doors, roof style, and color. The Town can require design standards in historic districts.

Local governments cannot under state law enforce riparian stream buffer regulations that are stricter than what the State allows. The Town can regulate the amount of impervious surface area permitted in different parts of the town and the provision of stormwater control measures for water quality and quantity. In some areas, the Town can regulate additional water contaminants, such as nitrogen and phosphorus.

Case law requires that improvements required of a development be both reasonably proportional and related to their impacts. This means that developments make improvements to the subject site and the street frontage for the subject site. Development cannot be required to resolve existing issues.

The Town requires development to make transportation improvements for their portion of sites in accordance with the adopted Comprehensive Transportation Plan. This can include right-of-way dedication, installation of sidewalk or multi-use paths, curb and gutter, street widening, greenways, and contributions towards medians. Through impact analyses, the Town and NCDOT may in some cases be able to require turn lanes, signal timing adjustments, and contributions towards new traffic signals. Development is responsible for the installation of new streets (and associated elements such as street trees and street lighting) and water and sewer infrastructure. Public infrastructure is eventually taken over for maintenance by the Town or other public agency after completion.