Capital Boulevard North Upgrade (Raleigh to Wake Forest)

Capital Boulevard North Upgrade (Raleigh to Wake Forest)

Project Overview

​Final design and development is underway to improve traffic congestion and travel times on Capital Boulevard (U.S. 1) between I-540 in Raleigh and Purnell/Harris roads in Wake Forest.

The proposed project would convert the road from a four-lane, median-divided roadway with partial access control (private driveways and side streets) to a six-lane controlled-access highway with interchanges. 

Controlled access means ramps at interchanges would provide entry onto the roadway, cross streets could have overpasses built over them, and private driveways would be prohibited.​

The project was studied as a possible toll road from January 2024 to November 2025. That evaluation has ended and the project is proceeding as a traditional, non-tolled roadway. 

Construction is scheduled to begin in 2031.

Sign Up for Project Updates

 

Proposed Segments

A - I-540 to Durant/Perry Creek Roads

B - Durant/Perry Creek Roads to Burlington Mills Road

C - Burlington Mills Road to NC 98 Business/Durham Road

D - NC 90 Business/Durham Road to Purnell/Harris Roads

Design work is in progress for the A and B segments. Design work is not currently in progress for the C and D segments. Design work is anticipated to re-start in late 2026 for the C and D segments.

Interactive Segments Area Map

 

What's Happening Now?

In June 2026, geotechnical work​ began on the project. Geotechnical work involves studying soil, rock and groundwater conditions to ensure a construction project is designed and built on a stable and suitable foundation.​